pozadí
Czech versionEnglish version Refractory Technologies Land Constructions Highrise Constructions
Teplotechna Ostrava a. s. Teplotechna Ostrava a. s. Teplotechna Ostrava a. s. Teplotechna Ostrava a. s.
pozadí
Teplotechna Ostrava a. s.
Power Masts
lista.gif, 975B
Pre-stressed concrete columns for the production of high-voltage
Home page - Highrice Construction
and low-voltage networks and railway systems.

lista.gif, 975B


The manufacturer is the company of GASTEL from Poland, supplying these masts to the power distributors companies throughout Poland. The masts are manufactured in the GASTEL manufacturing plant in Karsin, located about 50 km to the south from Gdañsk.

Product description and characteristic
  • Concrete pre-stressed mast used for the construction of outdoor power networks (low-voltage and high-voltage) and column transformer stations
  • Standards lengths manufactured: 9 -18 m
  • Effective force up to 17.5 kN
  • Long life
  • No surface finish (painting) is required
  • Allows for increased suspension length
  • Replacement of spatial structures with a mono-pipe allows for limiting the size covered by the line
  • Can be used as supports and load-carrying poles
  • A number of other usage options such as advertisement carrying, antennas, lightning conductors, etc


Comprehensive services in the construction of power networks and railways systems

We are offering the following to our business partners
  • Engineering activities – assurance of relevant permits and contract execution
  • Preparation of design documentation
  • Deliveries of high-quality products in short lead-times
  • Transit to the construction site
  • Construction execution
Energetické sloupy

lista.gif, 975B

Teplotechna Ostrava a. s.

Pic Pic
Pic Pic
Pic Pic


This web presentation
respects standard W3C.

Valid XHTML  1.0 Transitional Valid CSS!


Design Teplotechna Ostrava a.s.
© 2002. All rights reserved

Back  
 
Teplotechna Ostrava a. s. Teplotechna Ostrava a. s. pozadí
pozadí